Nicolay sent 25 messages. Amp made about 750 tool calls and 7 commits.
Inline views in Amp, from removing Flint charts on October 10 to the last fix on October 23. Counted from git and the five threads behind it.
October 10, Berlin time
Dots are Nicolay’s messages, ticks are commits. Hover a dot, or use the arrows.
Every commit
Lines removed and added. Flint went out first, then views came in.
Tool calls are estimates from the thread transcripts. Two later fixes came from other people: Hamish stopped a flicker with classic scrollbars, and Quinn made views fit their content.